Total Open Work by Assignee

Using the Total Open Work by Assignee section, you can view the breakdown of work for each assignee based on the task types .

A horizontal bar graph represents the open work for each assignee with color codes for individual task types.

In the graph, horizontal axis represents total number of open tasks and vertical axis represents the assignee.

Related concepts

Assignee Open Work

Details

Related references

Task Analytics

Task Metrics

© 2022 Digital.ai Inc. All rights reserved.